STATEMENT VI CONSTRUCTION AND EQUIPMENT Appropriation for construction and equipment, 1917-1918. Reno Electrical Works Commercial Hardware Co. J. R. Bradley Co... Reno Electrical Works Baker & Hamilton. Edw. W. Brown. G. A. Metcalf.. Commercial Hardware Co. Verdi Lumber Co. Expenditures $2.500.00 $113.84 263.14 309.38 90.00 21.85 5.40 6.11 5.50 5.00 291.17 63.00 Products raised as follows (values hereto attached computed at prices $5.00 28.00 1.50 2.50 5.60 72.10 10.00 32.50 5.00 9.75 7.20 17.70 3.25 100.00 46.15 150.00 23.50 39.60 5.00 33.60 184.44 300.00 5.00 22.25 $1,109.64 $2,075.44 3,000.00 8,132.00 $16,206.94 $13.178.48 1,109.64 14.289.12 $30,409.06 Deduct board and room of farm and garden employees (no account of same on 1,440.00 31,936.06 Net profit $16.741.60 INVENTORY OF THE HOSPITAL FOR MENTAL DISEASES Giving estimates of the approximate value of the real estate and personal property owned by the State of Nevada, December 31, 1918 Hospital farm consisting of 208 acres, improved and under fence, with water right, 1200 interest in Sullivan-Kelley ditch, irrigating ditches, etc.. at $200 per acre..... Hospital buildings: 475 $41,600.00 Main Building. Female Ward Building.. Killarney Hall, two-story brick Laundry, one-story brick Morgue $125,000.00 165,000.00 5,000.00 3,000.00 2,000.00 1,560.00 Machine and carpenter shop, consisting of brick building, lathe, drill-press, emery stand, carpenter tools, 3-hp. motor, shafting, belts and pulleys, and coffee mill Blacksmith shop, concrete, with forge, blower, anvil and tools, grind-stones, shafting and belts, etc. Kitchen and pantries, brick, including range, coffee urns, steam-cooking kettles, etc... Receiving hospital, stone building, with basement. Power plant, small brick building, wood-stave pipe line, with headgate, 40-KVA generator, 42-hp. turbine wheel, 3-KW exciter, switchboard with fixtures and transformer, 15-hp. motor direct connected to centrifugal pump, 5-inch water main to supply tank, main high-tension wiring to substation Pumping plant, wooden building, 7-hp. motor belt connected to triplex pump, belts, pulleys and shafting, pipe line, supply tank and tower, fire system, including 1,000 feet of 5-inch steel pipe, 5 fire plugs, about 500 feet of 2-inch hose and 250 feet of 1-inch hose.. Laundry equipment, flatwork ironer, washing machine, wringer, electric irons, heating stove, 2 dry rooms, 72-hp. motor, shafting, belting and pulleys, 12-hp. boiler, pipes, valves and fittings fittings, ammonia Wood-sawing outfit, iron saw-frame, 72-hp, motor, belting, 3 saws. 3,425.00 5,000.00 2,000.00 420.00 2,000.00 3,500.00 3,000.00 Oil supply system, two 13,000-gallon tanks with pipe and valves, boiler. Bakery department, oven, mixer, sifter, bread cabinet, 5-hp. motor, shafting, belting and pulleys, furnace, tables, boxes, troughs, tools, etc.. 1,000.00 Farm machinery, tools and equipment, vehicles, etc.. 1,550.00 Dairy department, silo, stalls and stanchions, milking machines, churns, separator, butter worker, Babcock testing outfit, equipment.. 2,500.00 Live stock, dairy cows, bulls and calves, horses and poultry 8.460.00 1.120.00 Ward A, furnishings, personal property, as per inventory. 1.674.00 1.838.58 2,269.39 1,081.20 1.782.30 1.957.65 1,433.00 233.90 Female night-watch quarters. 120.40 Supervisor's office, furnishings, etc.. 250.00 Reception room, furniture, etc. 65.00 Main entrance hall, furniture, etc. 100.00 Club-room, furniture, books, etc.. 1,150.00 Recreation Hall, furniture, moving-picture machine, piano. 400.00 Superintendent's office, furniture, etc.. 250.00 Supervisor's quarters, furnishings. 450.00 Officers' and employees' dining-room equipment. 389.60 Matron's sewing-room 226.00 Operating-room, equipment and surgical instruments. 500.00 50.00 Superintendent's residence, furnishings. 1,142.25 Total $302,958.27 |